Condition Assessment of the Region’s Storm Sewer Infrastructure
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
Detailed condition assessment of the Region of Peel’s storm sewer infrastructure to determine its condition and to identify short-term and long-term remedial actions necessary to maintain the storm sewer infrastructure. Permanent Pool Volume provided in SWM Facility is 7823m3 (regional storm) In 2008, The Region of Peel constructed a storm water Management Facility at Mayfield Road and Heart Lake
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Condition Assessment of the Region’s Storm Sewer Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Detailed condition assessment of the Region of Peel’s storm sewer infrastructure to determine its condition and to identify short-term and long-term remedial actions necessary to maintain the storm sewer infrastructure. Permanent Pool Volume provided in SWM Facility is 7823m3 (regional storm) In 2008, The Region of Peel constructed a storm water Management Facility at Mayfield Road and Heart Lake Road to service a tributary area of 22.3 ha, being comprised of 8.7 ha of arterial road drainage and 13.6 ha lands additional area which drains to the arterial road right of way. This facility provides storm water Quality Control (Enhanced Level i.e. 80% Total Suspended Solids removal) and Erosion Control and maintain Water Quantity flows below existing flow rates up to an including the Regional Storm. On June 6, 2008 the Ministry of the Environment issued a Certificate of Approval to the Region of Peel to construct, operate and maintain the prescribed infrastructure, including a condition (No.4) requiring the Region of Peel properly operate and maintain the infrastructure to protect the environment. To demonstrate compliance with the MOE authorization the Region of Peel operates a monitoring program. The program showed that the facility has deteriorated and that without rehabilitation, will not provide the function as per its original design. The purpose of this project is to restore the original facility functions to protect the environment, enhance the ability of the region through improved technology to operate and maintain the infrastructure, improve the infrastructure efficiency and reduce long term maintenance costs. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
