Condo Building - Garage
Sector: Commercial • Location: Chicago, Illinois, United States of America
Source: Dodge USA
building will rise 55 feet and hold exclusively condominiums - exterior design consisting of a brick cladding punctured by windows with a metal clad vertical element running up the center of the front facade. Balconies will flank the north and south corners of the building facing the street - eight condo units will all have three bedrooms and two bathrooms, with the upper six units having private
- Status
- Prospective
- Sector
- Commercial, Metal, Car parking, Road, Residential, Automotive, Manufacturing (Industrial)
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Condo Building - Garage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | building will rise 55 feet and hold exclusively condominiums - exterior design consisting of a brick cladding punctured by windows with a metal clad vertical element running up the center of the front facade. Balconies will flank the north and south corners of the building facing the street - eight condo units will all have three bedrooms and two bathrooms, with the upper six units having private balconies. Eight parking spaces will be located in an interior garage accessed from the alley. Fo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Car parking, Road, Residential, Automotive, Manufacturing (Industrial) |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
