Conduit Panamericana/Tacna Solar Plant

Sector: Commercial • Location: Peru

Source: World Bank Group

Project
Active

Panamericana solar S.A.C. was created to build, own and operate a 20 MW solar project in the rural Arequipa region of southwestern Peru. In 2011, The project company was a joint venture between 3 sponsors: the Spanish firms Grupo T solar and Solarpack, and the U.S. based Assured guaranty Ltd.

The project would sell power to the SEIN grid system and had obtained through tender a 20 year PPA to se

Project Information FAQ

Project Information

5 Q
The project “Conduit Panamericana/Tacna Solar Plant” is an infrastructure initiative in the Commercial sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Panamericana solar S.A.C. was created to build, own and operate a 20 MW solar project in the rural Arequipa region of southwestern Peru. In 2011, The project company was a joint venture between 3 sponsors: the Spanish firms Grupo T solar and Solarpack, and the U.S. based Assured guaranty Ltd. The project would sell power to the SEIN grid system and had obtained through tender a 20 year PPA to sell power from the Peruvian Ministry of Mines and Energy. Total project investment was scheduled to be USD 87.3 million,, with the expected project commissioning in 2012. Update: In 2012 the project, along with the Tacna solar facility were purchased by the US firm Conduit Capital partners. Conduit then achieved as USD 185 million loasn form OPIC to finance the project in June 2012. Total project cost was USD 210 million. Operations commenced in March 2013. http://www.pehub.com/172879/conduit-capital-backs-solar-projects/ http://www.pv-magazine.com/news/details/beitrag/185-million-earmarked-for-40-mw-peruvian-solar-project_100007425/#axzz2Ik3hN1gl

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data