logo
ProjectPlanning Schematics

Coneflower Solar - 235 MW

One of 10,000+ projects Taiyo tracks in Minnesota.

Source: Dodge

235 megawatt solar facility in Lyon County across 1,723 acres within a 2,299 acre site in Custer Township. Enough power for about 49,000 homes.Two scenarios. In the MISO Scenario, Coneflower Solar will construct a new project substation in the north-central portion of the site and interconnect to the existing Lyon County to Lake Yankton 115 kilovolt (kV) transmission line via an Xcel Energy switch

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Solar, Commercial
Location
Custer Township, Minnesota, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Coneflower Solar - 235 MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Coneflower Solar - 235 MW” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Custer Township, Minnesota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

235 megawatt solar facility in Lyon County across 1,723 acres within a 2,299 acre site in Custer Township. Enough power for about 49,000 homes.Two scenarios. In the MISO Scenario, Coneflower Solar will construct a new project substation in the north-central portion of the site and interconnect to the existing Lyon County to Lake Yankton 115 kilovolt (kV) transmission line via an Xcel Energy switching station and short (up to 500 feet) 115 kV transmission line. In the Garvin Scenario, Coneflow...

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Custer Township

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Solar, Commercial

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project