Conejo Summit Building 1G
Sector: Cement • Location: Thousand Oaks, California, United States of America
Source: Dodge
Building 1G would be constructed on a 4.07 acres (177,212 SF) lot (VTTM No. 6021 Lot 7). The building would contain a total of 50,460 SF, with approximately 5,000 SF of office (ground floor and mezzanine) and 45,460 SF of manufacturing floor area
- Status
- Prospective
- Sector
- Cement, Residential, Warehouse, Commercial, Manufacturing (Industrial)
- Location
- Thousand Oaks, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Conejo Summit Building 1G
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Building 1G would be constructed on a 4.07 acres (177,212 SF) lot (VTTM No. 6021 Lot 7). The building would contain a total of 50,460 SF, with approximately 5,000 SF of office (ground floor and mezzanine) and 45,460 SF of manufacturing floor area |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Thousand Oaks |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Residential, Warehouse, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
