Conestogo Park Square - Block 7
Sector: Hydro • Location: Waterloo, Ontario, Canada
Source: Dodge
Block 7 is situated south of Block 5, and has frontages along Conestogo Road and Street C. This block will be comprised of two residential buildings: Tower 7A at 19 storeys with low-rise podium and a mid-rise residential building (Building 7B at 9 storeys) along Conestogo Road. Building 7 public realm includes streetscape enhancements to Conestogo Road and a pedestrian corridor and landscaped area
- Status
- Prospective
- Sector
- Hydro, Residential, Road, Commercial, Car parking, Automotive
- Location
- Waterloo, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Conestogo Park Square - Block 7
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Block 7 is situated south of Block 5, and has frontages along Conestogo Road and Street C. This block will be comprised of two residential buildings: Tower 7A at 19 storeys with low-rise podium and a mid-rise residential building (Building 7B at 9 storeys) along Conestogo Road. Building 7 public realm includes streetscape enhancements to Conestogo Road and a pedestrian corridor and landscaped area. Block 7 interfaces with the proposed Hydro Corridor open space. Parking for Block 7 is provided... |
Budget |
Location
Country | Canada |
State | Ontario |
City | Waterloo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Hydro, Residential, Road, Commercial, Car parking, Automotive |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
