Congo - Development studies for hydroelectric sites and associated lines
One of 364 projects Taiyo tracks in Congo.
Source: African Development Bank (AfDB)
The Feasibility Study Project for Hydroelectric Developments in Congo follows a request (Ref. No. 322-24 dated July 11, 2024) from the Government of Congo seeking the Bank’s support for the feasibility study of hydroelectric developments at six (6) sites along the Congo River. The project aligns with the Congo’s National Development Plan (NDP 2022–2026). This study aims to prepare future electrici
- Sector
- Power Generation (CCGT), Road, Government
- Location
- Congo
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Congo - Development studies for hydroelectric sites and associated lines
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Feasibility Study Project for Hydroelectric Developments in Congo follows a request (Ref. No. 322-24 dated July 11, 2024) from the Government of Congo seeking the Bank’s support for the feasibility study of hydroelectric developments at six (6) sites along the Congo River. The project aligns with the Congo’s National Development Plan (NDP 2022–2026). This study aims to prepare future electricity generation projects, thereby contributing to the increase in Congo’s electricity production capacity. It will also incorporate environmental and social studies, as well as gender considerations. The project consists of three (03) components: i) Detailed design study of the hydroelectric developments, including energy evacuation infrastructure, access road studies, and climate change vulnerability analysis; ii) Environmental and social studies, along with a detailed gender analysis; and iii) Project management (audit and operations). The project is financed by a FAT-PRI grant of four hundred and fifty thousand Units of Account (UA 450,000) for conducting the feasibility study of hydroelectric developments at two (2) sites. The planned duration for these studies is eighteen (18) months. |
Original sector | Energy |
Budget |
Location
Country | Congo |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Congo
- Development Studies for Hydroelectric Sites and Associated Lines
- Congo - Rural Electrification Project
- Congo's Renewable Gas Development
- CEIF 2025 Technical Workshop
- Congo Energy & Investment Forum (CEIF) 2025
- Congo Energy & Investment Forum 2025
- Congo - Governance and Economic Diversification Support Programme (PAGDE) - Phase I
- Forest Biomass for Wood Energy Development
