Congo - Development studies for hydroelectric sites and associated lines
Sector: Power Generation (CCGT) • Location: Congo
Source: African Development Bank (AfDB)
The Feasibility Study Project for Hydroelectric Developments in Congo follows a request (Ref. No. 322-24 dated July 11, 2024) from the Government of Congo seeking the Bank’s support for the feasibility study of hydroelectric developments at six (6) sites along the Congo River. The project aligns with the Congo’s National Development Plan (NDP 2022–2026). This study aims to prepare future electrici
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Feasibility Study Project for Hydroelectric Developments in Congo follows a request (Ref. No. 322-24 dated July 11, 2024) from the Government of Congo seeking the Bank’s support for the feasibility study of hydroelectric developments at six (6) sites along the Congo River. The project aligns with the Congo’s National Development Plan (NDP 2022–2026). This study aims to prepare future electricity generation projects, thereby contributing to the increase in Congo’s electricity production capacity. It will also incorporate environmental and social studies, as well as gender considerations. The project consists of three (03) components: i) Detailed design study of the hydroelectric developments, including energy evacuation infrastructure, access road studies, and climate change vulnerability analysis; ii) Environmental and social studies, along with a detailed gender analysis; and iii) Project management (audit and operations). The project is financed by a FAT-PRI grant of four hundred and fifty thousand Units of Account (UA 450,000) for conducting the feasibility study of hydroelectric developments at two (2) sites. The planned duration for these studies is eighteen (18) months. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
