logo
Project

Congo - Rural Electrification Project

One of 364 projects Taiyo tracks in Congo.

Source: African Development Bank (AfDB)

The Rural Electrification Project is part of a national programme for the electrification, from the interconnected electricity grid, of 53 rural centres in 10 of the 12 Departments of Congo. The programme aims to contribute to improving the living conditions of rural communities through sustainable access to electricity and to boost the accelerated municipalisation programme initiated by the Gover

Sector
Commercial, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road, Government
Location
Congo
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Congo - Rural Electrification Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Congo - Rural Electrification Project” is an infrastructure initiative in the Commercial sector, located in Congo. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Rural Electrification Project is part of a national programme for the electrification, from the interconnected electricity grid, of 53 rural centres in 10 of the 12 Departments of Congo. The programme aims to contribute to improving the living conditions of rural communities through sustainable access to electricity and to boost the accelerated municipalisation programme initiated by the Government in 2004 aimed at providing all District headquarters with basic social infrastructure. The project should make it possible to provide grid connection and electrical energy from hydroelectric and gas-fired plants to: (i) 5,100 households or 25,500 inhabitants; (ii) 17 health centres; (iii) 40 educational establishments; (iv) 24 boreholes; (iv) 38 administrative centres and companies; and (v) a commercial area. The total cost, net of taxes, is estimated at UA 15.67 million. The main expected outputs at the end of 48 months of project implementation are: (i) construction of 305 km of medium and low voltage distribution grids; (ii) building of 71 MV/LV transformer stations; (iii) electrification of 59 new localities, including two rural communities and two District headquarters; (iv) installation of 5,100 connections; (v) installation of 2,255 street lighting units; and (vi) capacity building for public entities of the electricity sub-sector. The total project cost, net of taxes and customs duties, is estimated at UA 15.67 million, comprising UA 11.46 million in foreign exchange (73.11%) and UA 4.21 million in local currency (26.89%). It is focused on two main components, namely: A) Electrical Infrastructure; and B) Project Management Support.

Original sector

Energy

Budget

Location

Country

Congo

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project