Congo - Rural Electrification Project
One of 364 projects Taiyo tracks in Congo.
Source: African Development Bank (AfDB)
The Rural Electrification Project is part of a national programme for the electrification, from the interconnected electricity grid, of 53 rural centres in 10 of the 12 Departments of Congo. The programme aims to contribute to improving the living conditions of rural communities through sustainable access to electricity and to boost the accelerated municipalisation programme initiated by the Gover
- Sector
- Commercial, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road, Government
- Location
- Congo
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Congo - Rural Electrification Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Rural Electrification Project is part of a national programme for the electrification, from the interconnected electricity grid, of 53 rural centres in 10 of the 12 Departments of Congo. The programme aims to contribute to improving the living conditions of rural communities through sustainable access to electricity and to boost the accelerated municipalisation programme initiated by the Government in 2004 aimed at providing all District headquarters with basic social infrastructure. The project should make it possible to provide grid connection and electrical energy from hydroelectric and gas-fired plants to: (i) 5,100 households or 25,500 inhabitants; (ii) 17 health centres; (iii) 40 educational establishments; (iv) 24 boreholes; (iv) 38 administrative centres and companies; and (v) a commercial area. The total cost, net of taxes, is estimated at UA 15.67 million. The main expected outputs at the end of 48 months of project implementation are: (i) construction of 305 km of medium and low voltage distribution grids; (ii) building of 71 MV/LV transformer stations; (iii) electrification of 59 new localities, including two rural communities and two District headquarters; (iv) installation of 5,100 connections; (v) installation of 2,255 street lighting units; and (vi) capacity building for public entities of the electricity sub-sector. The total project cost, net of taxes and customs duties, is estimated at UA 15.67 million, comprising UA 11.46 million in foreign exchange (73.11%) and UA 4.21 million in local currency (26.89%). It is focused on two main components, namely: A) Electrical Infrastructure; and B) Project Management Support. |
Original sector | Energy |
Budget |
Location
Country | Congo |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Congo
- Congo - Integrated Agricultural Value Chains Development Project (PRODIVAC)
- Congo - Multi-Resource Forest Inventory for Preparation of a Land Allocation Plan
- CONGO DIGITAL TRANSFORMATION
- Republic of Congo - Investment Climate and Forest Governance Support Project (PACIGOF)
- Congo - The Brazzaville and Pointe Noire Sanitation Project
- Congo - Economic and Financial Reform Support Programme (PAREF)
- Congo - Investment Climate and Forest Governance Support Project (PACIGOF)
- Congo - Expenditure Circuit and Poverty Indicators Improvement Support Project (PACDIP)