Project

The Rural Electrification Project is part of a national programme for the electrification, from the interconnected electricity grid, of 53 rural centres in 10 of the 12 Departments of Congo. The programme aims to contribute to improving the living conditions of rural communities through sustainable access to electricity and to boost the accelerated municipalisation programme initiated by the Gover

Project Information FAQ

Project Information

4 Q
The project “Congo - Rural Electrification Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Congo. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Rural Electrification Project is part of a national programme for the electrification, from the interconnected electricity grid, of 53 rural centres in 10 of the 12 Departments of Congo. The programme aims to contribute to improving the living conditions of rural communities through sustainable access to electricity and to boost the accelerated municipalisation programme initiated by the Government in 2004 aimed at providing all District headquarters with basic social infrastructure. The project should make it possible to provide grid connection and electrical energy from hydroelectric and gas-fired plants to: (i) 5,100 households or 25,500 inhabitants; (ii) 17 health centres; (iii) 40 educational establishments; (iv) 24 boreholes; (iv) 38 administrative centres and companies; and (v) a commercial area. The total cost, net of taxes, is estimated at UA 15.67 million. The main expected outputs at the end of 48 months of project implementation are: (i) construction of 305 km of medium and low voltage distribution grids; (ii) building of 71 MV/LV transformer stations; (iii) electrification of 59 new localities, including two rural communities and two District headquarters; (iv) installation of 5,100 connections; (v) installation of 2,255 street lighting units; and (vi) capacity building for public entities of the electricity sub-sector. The total project cost, net of taxes and customs duties, is estimated at UA 15.67 million, comprising UA 11.46 million in foreign exchange (73.11%) and UA 4.21 million in local currency (26.89%). It is focused on two main components, namely: A) Electrical Infrastructure; and B) Project Management Support.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data