Congo-Gabon road and transport facilitation project
Sector: Bridge • Location: Gabon
Source: European Union Africa Infrastructure Trust Fund
The Libreville-Brazzaville road and transport facilitation Project will mainly consist of : (i) the construction of the Ndendé-Doussala section (49 km) in Gabon, (ii) the rehabilitation of the Ngongo-Kibangou section (132 km), and the construction of the Kibangou-Dolisie section (93 km) in Congo. In addition to the road construction component, the Project includes components related to transport a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Libreville-Brazzaville road and transport facilitation Project will mainly consist of : (i) the construction of the Ndendé-Doussala section (49 km) in Gabon, (ii) the rehabilitation of the Ngongo-Kibangou section (132 km), and the construction of the Kibangou-Dolisie section (93 km) in Congo. In addition to the road construction component, the Project includes components related to transport and trade facilitation in order to ensure that the anticipated benefits of time and cost savings, improved logistics and trade actually result from the development of the infrastructure. The facilitation measures include the construction of a joint border post and bridge as well as the lifting of non-physical barriers (harmonisation of customs procedures, etc.), which will likely induce a substantial increase in the volume of trade (mostly agricultural and pastoral products) between the two countries and lead to a significant drop in transport costs. The EU-AITF Technical Assistance grant will be used to finance the recruitment of an international consulting firm to strengthen the existing project management capacity at ECCAS for the implementation of this multinational project. It will enable a rapid start-up, ensure effective implementation of the project and prevent significant procurement and contract management delays seen in previous multinational transport projects. In addition, the grant will enable the establishment of a joint border post between the two countries and of a human-wildlife conflict management system for the Mont Reserve Fouari at the Congo-Gabon border. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
