Congo LNG Phase 2 Project
The owner, status and timeline of this project. A free account opens every field.
Source: Oil Review Africa
The Congo LNG project by Eni advances to Phase 2 with gas introduced into the new offshore infrastructure system and the Nguya FLNG floating liquefaction unit ready to support operations. The project includes a 3 million tonnes per annum capacity supported by three production platforms and the Scarabeo 5 unit for gas treatment and compression. It is linked to the offshore Nené and Litchendjili fie
- Status
- Under Construction
- Sector
- LNG, Natural Gas, Oil and Gas
- Location
- Congo
- Updated
- 22 Jul 2026
- Source
- Oil Review Africa
ConstructChat
Ask ConstructChat about Congo LNG Phase 2 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Congo LNG project by Eni advances to Phase 2 with gas introduced into the new offshore infrastructure system and the Nguya FLNG floating liquefaction unit ready to support operations. The project includes a 3 million tonnes per annum capacity supported by three production platforms and the Scarabeo 5 unit for gas treatment and compression. It is linked to the offshore Nené and Litchendjili fields in the Marine XII license and aims to export the first LNG cargo early next year. |
Original sector | Energy |
Location
Country | Congo |
Source
Source | Oil Review Africa |
URL |
More Details
Record type | Project |
Sector | LNG, Natural Gas, Oil and Gas |
Article published date | 2025-12-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project