Congo River port terminal in Matadi
The owner, status and timeline of this project. A free account opens every field.
Source: InfraPPPWorld
The facility will, in Phase 1, consist of two berths with a total length of 350 m and capable of handling 120,000 twenty-foot equivalent units TEU and 350,000 metric tons of cargo per year.It is estimated that the total capital expenditure of the project for Phase 1 will be around US$100 million and it is due to start operations in 2015. This Phase 1 construction is expected to be completed in a p
- Status
- Closed
- Sector
- Warehouse
- Location
- Democratic Republic of the Congo
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Congo River port terminal in Matadi
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The facility will, in Phase 1, consist of two berths with a total length of 350 m and capable of handling 120,000 twenty-foot equivalent units TEU and 350,000 metric tons of cargo per year.It is estimated that the total capital expenditure of the project for Phase 1 will be around US$100 million and it is due to start operations in 2015. This Phase 1 construction is expected to be completed in a period of 18 to 24 months. A planned second phase would double the size of the terminal. |
Original sector | Transport |
Budget |
Location
Country | Democratic Republic of the Congo (DRC) |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Warehouse |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project