Conneaut Active Anode Materials Facility
Sector: Water Supply and Storage • Location: Conneaut, Ohio, USA
Source: Construction Review
The Conneaut Active Anode Materials (AAM) facility is a large-scale industrial project in Northeast Ohio focused on producing synthetic graphite for advanced battery technologies. The project involves a phased construction approach, starting with a finishing and blending plant followed by full-scale graphitization and purification infrastructure. It includes specialized high-temperature furnaces o
- Status
- Under Construction
- Sector
- Water Supply and Storage, Rail, Warehouse, Energy Storage, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT)
- Location
- Conneaut, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Construction Review
ConstructChat
Ask ConstructChat about Conneaut Active Anode Materials Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Conneaut Active Anode Materials (AAM) facility is a large-scale industrial project in Northeast Ohio focused on producing synthetic graphite for advanced battery technologies. The project involves a phased construction approach, starting with a finishing and blending plant followed by full-scale graphitization and purification infrastructure. It includes specialized high-temperature furnaces operating above 3,000°C, heavy industrial foundations, integration with high-voltage electrical infrastructure, and logistics connections via rail and deep-water port access. |
Original sector | Buildings |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Conneaut |
Source
Source | Construction Review |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Warehouse, Energy Storage, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT) |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in USA
- Replacement of Badger Turbo Meters
- Golf Maintenance Building - Water Heater
- Replaced a 2" domestic water line
- Chill Water Pump Issue
- Pilot Program to Increase Water Supply
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- SR A1A/Collins Ave from 44 St to 4700 blk and Indian Creek from 41 St to 44 St and SR 112/W 41 St over the Indian Creek Waterway bridge
- Replace 3" domestic water meter located in mechanical room 088
