Connecticut Highway 254 Bridge Metallizing Project
Under construction · Connecticut · Last reported Jun 2025
Source: Construction Equipment Guide
Metallizing of 11 bridges in Thomaston and Litchfield, Connecticut, including the Connecticut Highway 254 bridge over Waterbury Road. The project includes traffic control measures and is scheduled for completion by November 30, 2025.
- Status
- Under Construction
- Sector
- Bridge, Road, Government
- Location
- Thomaston, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Construction Equipment Guide
ConstructChat
Ask ConstructChat about Connecticut Highway 254 Bridge Metallizing Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Metallizing of 11 bridges in Thomaston and Litchfield, Connecticut, including the Connecticut Highway 254 bridge over Waterbury Road. The project includes traffic control measures and is scheduled for completion by November 30, 2025. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Thomaston |
Source
Source | Construction Equipment Guide |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2025-06-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
