logo

Connecting Greece’s Cyclades Islands to the mainland’s power grid

Sector: Hotel • Location: Greece

Source: European Database

Project
Closed

Due to various environmental factors, Greece’s Cyclades Islands have not been able to install new autonomous power stations for electricity production. Instead, they have had to make do using oil and natural gas – which are expensive and not environmentally friendly.To overcome this limitation, this EU-funded project is connecting the Cyclades islands to the mainland’s power grid, thus providing a

Project Information FAQ

Project Information

4 Q
The project “Connecting Greece’s Cyclades Islands to the mainland’s power grid” is an infrastructure initiative in the Hotel sector, located in Greece. Taiyo aggregates data on it from European Database.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Due to various environmental factors, Greece’s Cyclades Islands have not been able to install new autonomous power stations for electricity production. Instead, they have had to make do using oil and natural gas – which are expensive and not environmentally friendly.To overcome this limitation, this EU-funded project is connecting the Cyclades islands to the mainland’s power grid, thus providing a reliable supply of electricity for the next 30 to 40 years. As a result, the islands will be able to reduce both energy production and use costs while improving their environmental footprint.Three phasesIn total, the project will install over 300 km of submarine cables, with 152.4 km having already been laid. These cables run from the mainland’s power stations to the various islands. The connections are being made in three phases.In phase A, which started in March 2018, the Syros oil-based power station went offline as the island was connected to the Hellenic Electricity Transmission System via the Lavrion GIS substation on the mainland. Today, the electricity needs of Syros, Paros, Antiparos, Naxos, Koufonissi, Schinoussa, Iraklia, Ios, Sikinos, and Foleganros are all covered by the mainland electricity transmission system.During phase B, Paros and Naxos will be connected to the mainland, and Naxos with Mykonos island. Finally, in phase C, a second interconnection between the mainland (Lavrion) and Syros will be made.Substantial environmental benefitsThe project offers a substantial environmental advantage. Not only does it reduce the energy required to power the islands, it also means the islands’ archaic, high-emission oil and natural gas stations can be shut down. By using underwater cables instead of overhead transmission lines, the project avoids disturbing the islands’ unique natural environment. Furthermore, the project’s infrastructure is designed to be able to make use of the islands’ vast renewable energy potential.Benefiting the Greek economyAccording to project coordinators, the Cyclades Interconnection is an important project for the Greek economy. By providing high-voltage electricity, it is boosting both tourism and economic activity. At the same time, the burden on consumers (through the public service obligations) is reduced as electricity consumers on the mainland will no longer be required to subsidise the electricity generated by the islands’ old power stations.VideosInauguration of Phase A of Cyclades InterconnectionTotal investment and EU fundingTotal investment for the project “The Interconnection of Cyclades Islands with the National Mainland Interconnected Transmission System” is EUR 389 059 862, with the EU’s European Regional Development Fund contributing EUR 138 176 324 through the “Competitiveness, Entrepreneurship” and “Competitiveness, Entrepreneurship and Innovation” Operational Programmes for the 2007-2013 and 2014-2020 programming periods. The investment falls under the priority “Energy Union and Climate”.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data