Connector Pipe Screen CPS Phase 4
Bidding · California · Last reported Oct 2026
Source: Dodge
Storm Sewer. Bids to Owner Public - Local November 23 at 03:00 PM (PST)
- Status
- Prospective
- Sector
- Rail, Steel, Metal, Water Supply and Storage, Cement, Manufacturing (Industrial), Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Government
- Location
- San Bernardino, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Connector Pipe Screen CPS Phase 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Storm Sewer. Bids to Owner Public - Local November 23 at 03:00 PM (PST) |
Original sector | Water, Sanitation And Waste Management |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Bernardino |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Rail, Steel, Metal, Water Supply and Storage, Cement, Manufacturing (Industrial), Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Government |
Article published date | 2026-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
