ConocoPhillips Wastewater Treatment Plant

Sector: Cement • Location: Roxana, Illinois, United States

Source: McCarthy Building Companies

Project
Completed

Construction on this complex wastewater treatment facility included excavation and removal of the existing 7.5 million-gallon per day treatment pond, sheet piling for the new ASU Basin and concrete work for a new 11 million-gallon activated sludge unit basin to meet the higher water usage required by the installation of the wet gas scrubbers to reduce air pollution. The quality of the water was al

Project Information FAQ

Project Information

4 Q
The project “ConocoPhillips Wastewater Treatment Plant” is an infrastructure initiative in the Cement sector, located in Roxana, Illinois, United States. Taiyo aggregates data on it from McCarthy Building Companies.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction on this complex wastewater treatment facility included excavation and removal of the existing 7.5 million-gallon per day treatment pond, sheet piling for the new ASU Basin and concrete work for a new 11 million-gallon activated sludge unit basin to meet the higher water usage required by the installation of the wet gas scrubbers to reduce air pollution. The quality of the water was also improved by the upgrade, including advanced technology to remove nitrates from the water. Particular attention to detail was required to meet new EPA permit requirements for gas scrubber effluent. There were two stainless steel and one carbon steel clarifier tanks with internals, plus new chemical addition tanks with containments, pipe, wire and controls. Other construction included auger cast and micro piles under solids scrubber clarifiers, plus a splitter box and micro piles under the flume. New construction included support steel for process piping and an electrical cable tray, a new switch house, RIE buildings and splitter box. The project was completed on a tight schedule, on a small site without disruption of an active refinery, despite record wet weather. The work completed on this project contributed to one million manhours of work performed without a recordable injury.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data