ConocoPhillips Wastewater Treatment Plant
Sector: Cement • Location: Roxana, Illinois, United States
Source: McCarthy Building Companies
Construction on this complex wastewater treatment facility included excavation and removal of the existing 7.5 million-gallon per day treatment pond, sheet piling for the new ASU Basin and concrete work for a new 11 million-gallon activated sludge unit basin to meet the higher water usage required by the installation of the wet gas scrubbers to reduce air pollution. The quality of the water was al
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction on this complex wastewater treatment facility included excavation and removal of the existing 7.5 million-gallon per day treatment pond, sheet piling for the new ASU Basin and concrete work for a new 11 million-gallon activated sludge unit basin to meet the higher water usage required by the installation of the wet gas scrubbers to reduce air pollution. The quality of the water was also improved by the upgrade, including advanced technology to remove nitrates from the water. Particular attention to detail was required to meet new EPA permit requirements for gas scrubber effluent. There were two stainless steel and one carbon steel clarifier tanks with internals, plus new chemical addition tanks with containments, pipe, wire and controls. Other construction included auger cast and micro piles under solids scrubber clarifiers, plus a splitter box and micro piles under the flume. New construction included support steel for process piping and an electrical cable tray, a new switch house, RIE buildings and splitter box. The project was completed on a tight schedule, on a small site without disruption of an active refinery, despite record wet weather. The work completed on this project contributed to one million manhours of work performed without a recordable injury. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
