Conroe Sewer Line Rehabilitation
Closed · Texas · Last reported Mar 2025
Source: Dodge
The project includes the rehabilitation of approximately 43,665 linear feet of 6-inch to 18-inch sanitary sewer lines. The project will be performed mainly by pipe burst method, with cured in place pipelining method in some instances. This project also includes the rehabilitation of existing manholes, CCTV, and point repairs in Conroe, Texas.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Government
- Location
- Conroe, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Conroe Sewer Line Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the rehabilitation of approximately 43,665 linear feet of 6-inch to 18-inch sanitary sewer lines. The project will be performed mainly by pipe burst method, with cured in place pipelining method in some instances. This project also includes the rehabilitation of existing manholes, CCTV, and point repairs in Conroe, Texas. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Conroe |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
