logo
ProjectClosed

Conservancy Adaptation Project

One of 1,195 projects Taiyo tracks in Guyana.

Source: World Bank

The project development objective of the Conservancy Adaptation Project (CAP) is to reduce the vulnerability of catastrophic flooding in the Guyana low-lying coastal area that is currently threatened by sea level rise resulting from global climate change. This project has been developed to guide a comprehensive upgrading program of the East Demerara Water Conservancy (EDWC) and lowland drainage sy

Status
Closed
Sector
Airport, Aerospace & Defense, Water Supply and Storage, Waste Processing and Treatment, Hydro, Government
Location
Guyana
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Conservancy Adaptation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Conservancy Adaptation Project” is an infrastructure initiative in the Airport sector, located in Guyana. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project development objective of the Conservancy Adaptation Project (CAP) is to reduce the vulnerability of catastrophic flooding in the Guyana low-lying coastal area that is currently threatened by sea level rise resulting from global climate change. This project has been developed to guide a comprehensive upgrading program of the East Demerara Water Conservancy (EDWC) and lowland drainage system, aimed at increasing discharge capacity and improving water level management. The project will also provide a technical framework for future donor intervention in the drainage and irrigation sector. In addition to developing the technical baseline for adaptation measures, the project will include some small infrastructure improvements to help cope with the immediate threats to the drainage system. The tools developed under the analytical component of the CAP will be used by the Government of the Republic of Guyana (GoG) and donor agencies to guide future investments. There are three components to the project. The first component is the pre-investment studies for engineering design of works. The objective of this component is to provide the hydrologic baseline necessary for contemplating rational interventions aimed at increasing the current discharge capacity of the flood control system. The second component is the investments in specific adaptation measures. The objective of this component is to counteract the effects of sea level rise, which has decreased the GoG's ability to manage water levels of the EDWC system. The third component is the institutional strengthening and project management. The objective of this component is to strengthen the institutional framework for flood control within the context of the national emergency management sector headed by the civil defense commission. The project will also support an institutional consolidation of flood control in Guyana to help create consensus around a medium and long term intervention strategy to help the country adapt to sea level rise

Original sector

FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Guyana

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Airport, Aerospace & Defense, Water Supply and Storage, Waste Processing and Treatment, Hydro, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project