logo

Conservancy Adaptation Project

Sector: Airport • Location: Guyana

Source: World Bank

Project
Closed

The project development objective of the Conservancy Adaptation Project (CAP) is to reduce the vulnerability of catastrophic flooding in the Guyana low-lying coastal area that is currently threatened by sea level rise resulting from global climate change. This project has been developed to guide a comprehensive upgrading program of the East Demerara Water Conservancy (EDWC) and lowland drainage sy

Project Information FAQ

Project Information

5 Q
The project “Conservancy Adaptation Project” is an infrastructure initiative in the Airport sector, located in Guyana. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project development objective of the Conservancy Adaptation Project (CAP) is to reduce the vulnerability of catastrophic flooding in the Guyana low-lying coastal area that is currently threatened by sea level rise resulting from global climate change. This project has been developed to guide a comprehensive upgrading program of the East Demerara Water Conservancy (EDWC) and lowland drainage system, aimed at increasing discharge capacity and improving water level management. The project will also provide a technical framework for future donor intervention in the drainage and irrigation sector. In addition to developing the technical baseline for adaptation measures, the project will include some small infrastructure improvements to help cope with the immediate threats to the drainage system. The tools developed under the analytical component of the CAP will be used by the Government of the Republic of Guyana (GoG) and donor agencies to guide future investments. There are three components to the project. The first component is the pre-investment studies for engineering design of works. The objective of this component is to provide the hydrologic baseline necessary for contemplating rational interventions aimed at increasing the current discharge capacity of the flood control system. The second component is the investments in specific adaptation measures. The objective of this component is to counteract the effects of sea level rise, which has decreased the GoG's ability to manage water levels of the EDWC system. The third component is the institutional strengthening and project management. The objective of this component is to strengthen the institutional framework for flood control within the context of the national emergency management sector headed by the civil defense commission. The project will also support an institutional consolidation of flood control in Guyana to help create consensus around a medium and long term intervention strategy to help the country adapt to sea level rise

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data