Consorcio Energetico Punta Cana
Sector: Commercial • Location: La Altagracia, Dominican Republic
Source: World Bank Group
The project consisted of a 12.5-MW diesel power plant. The project which required an average $1 million per 1-MW installed capacity began its commercial operation in 1994. The initial developer was Wartsila Power Development which sold the project to Dominican Republic's investors in 1994. In 2005, Endesa of Spain sold its 40% stake in Consorcio Energetico Punta Cana-Macao (CEPM)for US$23.7 millio
- Status
- Prospective
- Sector
- Commercial, Geothermal, Wind, Power Generation (CCGT), Power Transmission, Solar, Government
- Location
- La Altagracia, Dominican Republic
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Consorcio Energetico Punta Cana
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consisted of a 12.5-MW diesel power plant. The project which required an average $1 million per 1-MW installed capacity began its commercial operation in 1994. The initial developer was Wartsila Power Development which sold the project to Dominican Republic's investors in 1994. In 2005, Endesa of Spain sold its 40% stake in Consorcio Energetico Punta Cana-Macao (CEPM)for US$23.7 million, resulting in a capital gain for Endesa of US$8.3 million . The electricity is sold to business and residences located in an area not connected to Corporacion Dominicana de Electricidad (CDE), the state-owned utility. In 2000, MIGA issued an US$ 11.1 million guarantee to a bank providing financing for this project. In 2005, the project intended to expand its capacity with a 8.25MW wind power plant. The cost for the expansion project was estimated at US$42.5 million, of which IFC was offering a senior loan of $10 million and to fully guarantee up to a $12.5 million loan –in which ABN Amro Bank, Copenhagen Branch, was to provide a loan under a program sponsored by DANIDA, the Danish government’s development agency- for a total exposure to IFC of $22.5 million. In April 2014, the IFC approved a US$ million loan to CEPM in order to fund a 7 MW solar power plant to be built at Bavaro. The power plant was established with the goat to increase CEPM’s existing thermal generation facilities and displace their dispatch for fuel cost savings. The total investment was estimated at US$ 17 million. http://www.miga.org/screens/projects/guarant/regions/lac02/bch-dr.htm |
Original sector | Energy |
Budget |
Location
Country | Dominican Republic |
State | La Altagracia |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Wind, Power Generation (CCGT), Power Transmission, Solar, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Dominican Republic
- Nigua Free Zone Expansion Project
- Touristic Project: El Limón - Samaná Province
- Project development in Puerto Plata for: Real estate tourism, SEZ, Ports, Agro-industry, Marine, Renewable Energy - Block A1
- Industrial Free Zone Park Kosfs International
- Pedernales-Cabo Rojo: Construction of affordable houses
- Codacsa
- Agua Clara Wind Farm
- Parques Eolicos del Caribe
