Consorcio Energetico Punta Cana

Sector: Commercial • Location: La Altagracia, Dominican Republic

Source: World Bank Group

Project
Active

The project consisted of a 12.5-MW diesel power plant. The project which required an average $1 million per 1-MW installed capacity began its commercial operation in 1994. The initial developer was Wartsila Power Development which sold the project to Dominican Republic's investors in 1994. In 2005, Endesa of Spain sold its 40% stake in Consorcio Energetico Punta Cana-Macao (CEPM)for US$23.7 millio

Status
Prospective
Sector
Commercial, Geothermal, Wind, Power Generation (CCGT), Power Transmission, Solar, Government
Location
La Altagracia, Dominican Republic
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Consorcio Energetico Punta Cana

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Consorcio Energetico Punta Cana” is an infrastructure initiative in the Commercial sector, located in La Altagracia, Dominican Republic. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consisted of a 12.5-MW diesel power plant. The project which required an average $1 million per 1-MW installed capacity began its commercial operation in 1994. The initial developer was Wartsila Power Development which sold the project to Dominican Republic's investors in 1994. In 2005, Endesa of Spain sold its 40% stake in Consorcio Energetico Punta Cana-Macao (CEPM)for US$23.7 million, resulting in a capital gain for Endesa of US$8.3 million . The electricity is sold to business and residences located in an area not connected to Corporacion Dominicana de Electricidad (CDE), the state-owned utility. In 2000, MIGA issued an US$ 11.1 million guarantee to a bank providing financing for this project. In 2005, the project intended to expand its capacity with a 8.25MW wind power plant. The cost for the expansion project was estimated at US$42.5 million, of which IFC was offering a senior loan of $10 million and to fully guarantee up to a $12.5 million loan –in which ABN Amro Bank, Copenhagen Branch, was to provide a loan under a program sponsored by DANIDA, the Danish government’s development agency- for a total exposure to IFC of $22.5 million. In April 2014, the IFC approved a US$ million loan to CEPM in order to fund a 7 MW solar power plant to be built at Bavaro. The power plant was established with the goat to increase CEPM’s existing thermal generation facilities and displace their dispatch for fuel cost savings. The total investment was estimated at US$ 17 million. http://www.miga.org/screens/projects/guarant/regions/lac02/bch-dr.htm

Original sector

Energy

Budget

Location

Country

Dominican Republic

State

La Altagracia

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Wind, Power Generation (CCGT), Power Transmission, Solar, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project