logo

Consorcio Energia do Para – CEPA

Sector: Oil and Gas • Location: Brazil

Source: World Bank Group

Project
Active

In May 2016, Consorcio Energia do Para – CEPA, a partnership of the Brazilian companies Guascor do Brasil Ltda. (14,22%), Distribuidora Equador de Produtos de Petróleo Ltda (82%) and Soenergy Sistemas Internacionais de Energia S.A. (3,78%), was granted a 30-year authorization to build and operate 23 diesel fueled power plants located at the state of Para (131.7 MW in total capacity).

The power p

Status
Prospective
Sector
Oil and Gas, Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Consorcio Energia do Para – CEPA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Consorcio Energia do Para – CEPA” is an infrastructure initiative in the Oil and Gas sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In May 2016, Consorcio Energia do Para – CEPA, a partnership of the Brazilian companies Guascor do Brasil Ltda. (14,22%), Distribuidora Equador de Produtos de Petróleo Ltda (82%) and Soenergy Sistemas Internacionais de Energia S.A. (3,78%), was granted a 30-year authorization to build and operate 23 diesel fueled power plants located at the state of Para (131.7 MW in total capacity). The power plants were named UTE Afua, UTE Alenquer, UTE Almeirim, UTE Anajas, UTE Aveiro, UTE Cachoeira do Arari, UTE Chaves, UTE Cotijuba, UTE Faro, UTE Gurupa, UTE Jacareacanga, UTE Juruti, UTE Monte Alegre, UTE Muana, UTE Oeiras do Para, UTE Porto de Moz, UTE Prainha, UTE Salvaterra, UTE Santa Cruz do Arari, UTE Santana do Araguaia, UTE Sao Sebastiao da Boa Vista, UTE Soure and UTE Terra Santa. The total investment in the project was estimated at U$S 84.3 million (R$ 294.2 million). The government periodically runs public bidding for the sale of energy to the country´s distribution companies in the Northern region of the country. CEPA won the public bidding that took place in April 2016 by offering an average tariff of US$ 352.1/MWh (BRL 1228/MWh), 9,77% below the ceiling. Construction works were in its final stages by December of 2016, and commercial operations were set to commence in April 2017. In February 2017, Distribuidora Equador sold its shares in the project company to the other sponsors. Guascor increased its shareholding to 79% and Soenergy to 21%.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Oil and Gas, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project