Construct Consolidated Flight Base Operations Facility
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Construct Consolidated (TFI) Flight Base Operations Facility not to exceed 5,784 SM. This permanent facility will consolidate the functional elements of an active duty (AD) Operations Group, Operations Squadron (with its integral Base Operations Element), Aircraft Flight Equipment (AFE), and an Air National Guard (ANG) Air Refueling Squadron Operations Group, Operations Support Flight, Joint World
- Status
- Prospective
- Sector
- Road, Aerospace & Defense, Manufacturing (Industrial), Government, Commercial
- Location
- Fairchild Air Force Base, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Construct Consolidated Flight Base Operations Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construct Consolidated (TFI) Flight Base Operations Facility not to exceed 5,784 SM. This permanent facility will consolidate the functional elements of an active duty (AD) Operations Group, Operations Squadron (with its integral Base Operations Element), Aircraft Flight Equipment (AFE), and an Air National Guard (ANG) Air Refueling Squadron Operations Group, Operations Support Flight, Joint Worldwide Intelligent Communications System (JWICS), weather equipment infrastructure, and a Flight Ki... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Fairchild Air Force Base |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Aerospace & Defense, Manufacturing (Industrial), Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
