Construct Consolidated Rigging Facility HAAF
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Dodge
This is a new requirement to Construct a Consolidated Parachute Rigging Facility at Hunter Army Airfield, GA. The project includes parachute drying tower, packing lanes, overhead crane, parachute repair room, supply rooms, storage areas, and a classroom. Built-in building systems include fire alarm/mass notification, fire suppression, HVAC, energy management control system, electrical systems, com
- Status
- Closed
- Sector
- Telecommunications, Manufacturing (Industrial), Commercial, Power Generation (CCGT), Road
- Location
- Savannah, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Construct Consolidated Rigging Facility HAAF
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is a new requirement to Construct a Consolidated Parachute Rigging Facility at Hunter Army Airfield, GA. The project includes parachute drying tower, packing lanes, overhead crane, parachute repair room, supply rooms, storage areas, and a classroom. Built-in building systems include fire alarm/mass notification, fire suppression, HVAC, energy management control system, electrical systems, communications networks, cable TV, intrusion detection, closed circuit surveillance, and electronic ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Savannah |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Manufacturing (Industrial), Commercial, Power Generation (CCGT), Road |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
