Construct Consolidated Rigging Facility HAAF
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Dodge
This is a new requirement to Construct a Consolidated Parachute Rigging Facility at Hunter Army Airfield, GA. The project includes parachute drying tower, packing lanes, overhead crane, parachute repair room, supply rooms, storage areas, and a classroom. Built-in building systems include fire alarm/mass notification, fire suppression, HVAC, energy management control system, electrical systems, com
- Status
- Prospective
- Sector
- Commercial, Manufacturing (Industrial), Power Generation (CCGT), Road, Telecommunications
- Location
- Savannah, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Construct Consolidated Rigging Facility HAAF
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is a new requirement to Construct a Consolidated Parachute Rigging Facility at Hunter Army Airfield, GA. The project includes parachute drying tower, packing lanes, overhead crane, parachute repair room, supply rooms, storage areas, and a classroom. Built-in building systems include fire alarm/mass notification, fire suppression, HVAC, energy management control system, electrical systems, communications networks, cable TV, intrusion detection, closed circuit surveillance, and electronic ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Savannah |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Power Generation (CCGT), Road, Telecommunications |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
