Construct Phase 1 of the Mud Springs Trail System
Closed · Utah · Last reported Oct 2024
Source: Dodge USA
The scope of work includes construction of 7.11 miles of beginner and intermediate machine-built bike-optimized trail as part of the Mud Springs Trail System (MSTS). This RFP is for the five trails listed below. The trails are listed in groups that should be built together (Group A and Group B). The order of trails below is the order that the trails should be constructed (1 - 5). Group A: 5.10 mil
- Status
- Closed
- Sector
- Mass Transit, Commercial, Rail, Car parking, Automotive, Government
- Location
- Moab, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Construct Phase 1 of the Mud Springs Trail System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes construction of 7.11 miles of beginner and intermediate machine-built bike-optimized trail as part of the Mud Springs Trail System (MSTS). This RFP is for the five trails listed below. The trails are listed in groups that should be built together (Group A and Group B). The order of trails below is the order that the trails should be constructed (1 - 5). Group A: 5.10 miles total 1. Climbing Trail (1.98 miles, Beginner) 2. Perimeter Trail (3.12 miles, Beginner) Group... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Moab |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Commercial, Rail, Car parking, Automotive, Government |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in United States of America
- WMATA Orange and Blue Line Rehabilitation
- Dulles Metrorail Silver Line, Phase 2
- Broadway Substation Upgrades
- QLINE Streetcar Overhead Catenary System
- Blue Line Rail Power System Upgrades
- Congress Heights Station & Tunnel
- Navy Yard Metro West Entrance Modifications
- BART El Cerrito Del Norte Station Modernization Project
