logo

Constructing a hybrid power plant to supply the city of Agadez and its surroundings with electricity

Sector: Energy Storage • Location: France

Source: Proparco Groupe AFD (Agence Française de Développement)

Project
Ongoing

The project aims to create an additional power generation capacity in order to promote the economic and social development of the city of Agadez.More specifically, it provides for:The construction of a hybrid power plant (13 MW photovoltaic and 6 MW thermal), support for its operation and maintenance for two years, and the connection of the city of AgadezAssistance to the contracting authority and

Project Information FAQ

Project Information

4 Q
The project “Constructing a hybrid power plant to supply the city of Agadez and its surroundings with electricity” is an infrastructure initiative in the Energy Storage sector, located in France. Taiyo aggregates data on it from Proparco Groupe AFD (Agence Française de Développement).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project aims to create an additional power generation capacity in order to promote the economic and social development of the city of Agadez.More specifically, it provides for:The construction of a hybrid power plant (13 MW photovoltaic and 6 MW thermal), support for its operation and maintenance for two years, and the connection of the city of AgadezAssistance to the contracting authority and institutional support to assist and train engineers and technicians in Niger in photovoltaic technologies, so that they can operate large-scale solar power plants themselves in the short term.The rehabilitation of the distribution grid of the city of Agadez, whose current state does not allow a good energy distribution to and in the city, and the electrification of the neighboring town of Tibinitene.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data