logo

Constructing Bridge 00700181 REBID

Sector: Government • Location: Carrollton, Missouri, United States of America

Source: Dodge

Project
Closed

The proposed work includes the construction of a new 60 -0 single-span, precast voided deck-girder bridge with HP piling, concrete abutments, w-beam railing, and other required appurtenances. Replacement of Bridge. Construction Inspection Construction Phase: work with contractor on behalf of the County, assist with preconstruction conference, perform periodic site inspection, prepare change orders

Status
Closed
Sector
Government, Cement, Steel, Road, Commercial, Bridge, Rail, Residential
Location
Carrollton, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Constructing Bridge 00700181 REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Constructing Bridge 00700181 REBID” is an infrastructure initiative in the Government sector, located in Carrollton, Missouri, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed work includes the construction of a new 60 -0 single-span, precast voided deck-girder bridge with HP piling, concrete abutments, w-beam railing, and other required appurtenances. Replacement of Bridge. Construction Inspection Construction Phase: work with contractor on behalf of the County, assist with preconstruction conference, perform periodic site inspection, prepare change orders, inspect construction materials, check shop drawings submitted by contractor, conduct constructi...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Carrollton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Cement, Steel, Road, Commercial, Bridge, Rail, Residential

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project