logo
ProjectClosed

Construction 13 KV Electrical Distribution Improvement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

REMOVE (3) 100 AMP FUSED CUTOUTS. O INSTALL (3) NEW 600 AMP DISCONNECT SWITCHES. MAKE NORMALLY CLOSED. C> REMOVE (3)12 ACSR CONDUCTORS & (1) #2 ACSR NEUTRAL CONDUCTOR. 0 INSTALL (3) #4/0 ACSR CONDUCTORS 8 (1) #1/0 ACSR NEUTRAL CONDUCTOR. 0 INSTALL (3) 100 AMP FUSED CUTOUTS. FUSE 75A OR 0 MAKE ALL JUMPERS SOLID USING #410 ACSR. 0 INSTALL NEW ELECTRONIC RECLOSER. C> TRANSFER SECONDARY TO NEW POLE 0

Status
Closed
Sector
Government, Power Transmission, Power Generation (CCGT), Commercial
Location
Leland, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Construction 13 KV Electrical Distribution Improvement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Construction 13 KV Electrical Distribution Improvement” is an infrastructure initiative in the Government sector, located in Leland, Mississippi, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

REMOVE (3) 100 AMP FUSED CUTOUTS. O INSTALL (3) NEW 600 AMP DISCONNECT SWITCHES. MAKE NORMALLY CLOSED. C> REMOVE (3)12 ACSR CONDUCTORS & (1) #2 ACSR NEUTRAL CONDUCTOR. 0 INSTALL (3) #4/0 ACSR CONDUCTORS 8 (1) #1/0 ACSR NEUTRAL CONDUCTOR. 0 INSTALL (3) 100 AMP FUSED CUTOUTS. FUSE 75A OR 0 MAKE ALL JUMPERS SOLID USING #410 ACSR. 0 INSTALL NEW ELECTRONIC RECLOSER. C> TRANSFER SECONDARY TO NEW POLE 0 SWING EXISTING 41410 ACSR TO NEW POLE. REMOVE EXCESS CONDUCTOR AS REOUIRED.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Leland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Power Transmission, Power Generation (CCGT), Commercial

Article published date

2024-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project