Construction and Development of Power Distribution Infrastructure Work, Jamshedpur, Jharkhand
Sector: Manufacturing (Industrial) • Location: East Singhbhum, Jharkhand, India
Source: India Investment Grid (IIG)
Information Jharkhand State Electricity Board has come up with Construction and Development of Power Distribution Infrastructure Work, Jamshedpur, Jharkhand with a ticket size of 494.97 INR Crores. This project in Electricity Transmission sub-sector involves Laying up of Transmission Line The current status of the project is Tender Published and is being developed through the EPC route. Economic/S
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Jharkhand State Electricity Board has come up with Construction and Development of Power Distribution Infrastructure Work, Jamshedpur, Jharkhand with a ticket size of 494.97 INR Crores. This project in Electricity Transmission sub-sector involves Laying up of Transmission Line The current status of the project is Tender Published and is being developed through the EPC route. Economic/Social Impact of the Project Development of Distribution Infrastructure at Electric Supply Area Jamshedpur in District East Singhbhum, West Singhbhum, Saraikela-Kharsawan of Jharkhand State, Under Revamped Reforms-Based and Results-Linked,Distribution Sector SchemeSite survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning, and documentation of all items/material |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
