logo

Construction and Development of Water Supply System [Group C], Aligarh, Uttar Pradesh

Sector: Advanced Electronics • Location: Aligarh, Uttar Pradesh, India

Source: India Investment Grid (IIG)

Project
Closed

Information Uttar Pradesh Jal Nigam has come up with Construction and Development of Water Supply System [Group C], Aligarh, Uttar Pradesh with a ticket size of 92.94 INR Crores. This project in Water Treatment Plants sub-sector involves The current status of the project is Tender Publish and is being developed through the EPC route. Economic/Social Impact of the Project Uttar Pradesh Jal Nigam e

Project Information FAQ

Project Information

5 Q
The project “Construction and Development of Water Supply System [Group C], Aligarh, Uttar Pradesh” is an infrastructure initiative in the Advanced Electronics sector, located in Aligarh, Uttar Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Uttar Pradesh Jal Nigam has come up with Construction and Development of Water Supply System [Group C], Aligarh, Uttar Pradesh with a ticket size of 92.94 INR Crores. This project in Water Treatment Plants sub-sector involves The current status of the project is Tender Publish and is being developed through the EPC route. Economic/Social Impact of the Project Uttar Pradesh Jal Nigam envisages for the Construction and Development of Water Supply System [Group C], Aligarh, Uttar Pradesh with an estimate cost of 92.94 Crores. The scope of work includes design, supply, installation, commissioning of SCADA Automation of Water Supply consisting of 5 tube wells & 1 ZPS. SCADA automation shall be required to operate. the submersible pumps of 15 HP to 30 HP capacity installed in existing & New tube wells. The work includes providing redundant PLC's / RTU's to collect the data and transmitting it on GSM/GPRS backbone to MCS. The work also includes supply of electromagnetic flowmeter, pressure sensors, water level sensors, depth sensors, valve actuators smart energy meters for tube wells and, for delivery line for distribution outlet at OHT's, auto-phase reversal relays are to be installed in each soft starter.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data