logo

Construction at the Southeast Treatment Plant

Sector: Natural Gas • Location: San Franscisco, California, United States of America

Source: SF Water Power System

Project
Unknown

UPDATEChanges to the Biosolids' Biogas ProjectBiogas is a byproduct of the biosolids digestion treatment process. Our original plans for the Biosolids Digester Facilities Project included reusing 100% of the biogas, however we recently made changes to how the biogas will be used. The new plan will convert the biogas to renewable natural gas for injection into PG&E's existing gas pipeline. For more

Project Information FAQ

Project Information

3 Q
The project “Construction at the Southeast Treatment Plant” is an infrastructure initiative in the Natural Gas sector, located in San Franscisco, California, United States of America. Taiyo aggregates data on it from SF Water Power System.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

UPDATEChanges to the Biosolids' Biogas ProjectBiogas is a byproduct of the biosolids digestion treatment process. Our original plans for the Biosolids Digester Facilities Project included reusing 100% of the biogas, however we recently made changes to how the biogas will be used. The new plan will convert the biogas to renewable natural gas for injection into PG&E's existing gas pipeline. For more information, read frequently asked questions for the Biogas Utilization Project.The Southeast Treatment Plant (SEP) operates 24/7 to protect public health and the environment. For more than 70 years, San Francisco has relied on SEP to treat the majority of its wastewater. We are making generational investments so this vital facility can continue to work around the clock.As we continue to make progress with our infrastructure investments, we are proud to be providing jobs and contracting opportunities to local residents and businesses. When complete, the plant will work better, look better, and smell better for the community, our staff, and entire City!Construction Look-Ahead:2024 will be another busy year for construction at the Southeast Treatment Plant.Along Evans Avenue, the New Headworks Facility Project will finish installing the permanent Art Wall, titled “Whorl/Whirl: Our Circular Nature,” designed by artist Norie Sato. On the other side of the wall, crews have begun testing parts of the new facility, and the new Odor Control Unit is near completion.The Biosolids Digesters Facilities Project celebrated a milestone with a “Topping Off” ceremony when the project’s highest beam was installed. Additionally, lids for all five of the 65-foot-tall Digesters will be installed.Expect additional vehicles and crews in the area during the summer months, with occasional inconveniences due to trucks and increased construction activities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data