Construction Lake Marion Cameron Reach Water Line SOURCES SO
Sector: Waste Processing and Treatment • Location: Charleston, South Carolina, United States of America
Source: Dodge
The specifications summarize the SOW as follows: The Cameron Reach Water Main contract consists of the furnishing, installing, and placing into successful operation approximately 65,000 LF of 12-inch diameter water main pipe, 1,000 LF of 8-inch diameter water main pipe and all associated work. The contract includes all pipe, valves, appurtenances, roadway bores, horizontally directionally drilled
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial
- Location
- Charleston, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Construction Lake Marion Cameron Reach Water Line SOURCES SO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The specifications summarize the SOW as follows: The Cameron Reach Water Main contract consists of the furnishing, installing, and placing into successful operation approximately 65,000 LF of 12-inch diameter water main pipe, 1,000 LF of 8-inch diameter water main pipe and all associated work. The contract includes all pipe, valves, appurtenances, roadway bores, horizontally directionally drilled pipe, backfill, compaction, testing, quality control, safety, and all other related work required... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Charleston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
