Construction Mineral e-Transit Station & Ev Charging Site
Sector: Electric Vehicles (EVs) • Location: Mineral, Washington, United States of America
Source: Dodge
The information provided in this bid packet is for installation of an electric vehicle charging station at the site of an existing convenience market and construction of sidewalk along a portion of the adjacent public right-of-way located at 104 East Front Street, Mineral, WA 98355. 2. All drawings provided by Lewis County Transit have been developed and designed by local A/E firms. Additional que
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Government, Road, Car parking, Commercial, Manufacturing (Industrial)
- Location
- Mineral, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Construction Mineral e-Transit Station & Ev Charging Site
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The information provided in this bid packet is for installation of an electric vehicle charging station at the site of an existing convenience market and construction of sidewalk along a portion of the adjacent public right-of-way located at 104 East Front Street, Mineral, WA 98355. 2. All drawings provided by Lewis County Transit have been developed and designed by local A/E firms. Additional questions can be directed to Lewis County Transit as needed. It is the responsibility of the contrac... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Mineral |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Government, Road, Car parking, Commercial, Manufacturing (Industrial) |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 20 MDOULES 8 KW INSTALL EV CHARGER
- QLINE Streetcar Overhead Catenary System
- Metropolitan Park
- Sierra Regency Roof Eve Extensions
- 466135 CLOUD PL NE Local Roadway Paving Restoration
- 378944 Alley-47076042 Citywide Alley Restoration
- Community Food Projects Competitive Grant Program
- Hydrogen Delivery Technologies
