logo

Construction of a Bridge at Baie du Tombeau (in lieu of Pont Bruniquel)

Sector: Automotive • Location: Mauritius

Source: Road Development Authority (RDA), Mauritius (Projects)

Project
Active

Bruniquel Bridge is located along Baie du Tombeau Road (B29) at about 300m from the Baie du Tombeau Roundabout on Motorway M2. The bridge was constructed in 1926 in both reinforced concrete and masonry and has a span of 11.30 m and a width of 6.0 m. However, there is no footpaths for pedestrian on the sides of the bridges. The existing bridge is in a deplorable state. Moreover, the traffic flow in

Project Information FAQ

Project Information

4 Q
The project “Construction of a Bridge at Baie du Tombeau (in lieu of Pont Bruniquel)” is an infrastructure initiative in the Automotive sector, located in Mauritius. Taiyo aggregates data on it from Road Development Authority (RDA), Mauritius (Projects).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Bruniquel Bridge is located along Baie du Tombeau Road (B29) at about 300m from the Baie du Tombeau Roundabout on Motorway M2. The bridge was constructed in 1926 in both reinforced concrete and masonry and has a span of 11.30 m and a width of 6.0 m. However, there is no footpaths for pedestrian on the sides of the bridges. The existing bridge is in a deplorable state. Moreover, the traffic flow in both directions is quite high and includes a high percentage of heavy vehicles.  The RDA intends to construct a new bridge in lieu of Bruniquel Bridge of appropriate length/ section and width 12m which will cater for both 2 ways traffic and footpaths for pedestrian, to the required international standards and also to realign the existing approaches so as to eliminate sharp bends, improve visibility, and minimize risks of accidents.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data