Construction of a new Harbour Master’s office at Dam-en-terre
Sector: Hydro • Location: Quebec, Canada
Source: Infrastructure Canada
The project consists of building a new harbor master’s office. The new two-storey building will be managed by the Centre de villégiature Dam-en-Terre, a non-profit organization (NPO). The works include the development of the following spaces: A ground floor comprising: - a reception and reception room for rentals; - showers and toilets; - locker room; - a gallery and a waiting area; - a kitchenett
- Status
- Closed
- Sector
- Hydro, Seaport, Commercial, Residential
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Construction of a new Harbour Master’s office at Dam-en-terre
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of building a new harbor master’s office. The new two-storey building will be managed by the Centre de villégiature Dam-en-Terre, a non-profit organization (NPO). The works include the development of the following spaces: A ground floor comprising: - a reception and reception room for rentals; - showers and toilets; - locker room; - a gallery and a waiting area; - a kitchenette; - an office; - a mechanical room and a concierge. A floor comprising: - a kitchen and a dining room; - showers and toilets; - a concierge service; - lockers and an outdoor storage area for bicycles accessible to the public; - a terrace. Also included are excavation, foundation and landscaping. The ground floor and the first floor will be used for the needs of boaters and the community as well as cyclists, snowmobilers and those related to nautical activities. Note that the City of Alma will be the owner of the building, that the Centre de villégiature Dam-en-Terre is the site manager and that Rio Tinto Alcan is the owner of the land. In this sense, the company and the Town signed an emphyteutic lease. |
Original sector | Community, Culture and Recreation |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hydro, Seaport, Commercial, Residential |
Article published date | 2026-04-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Manitoba Hydro High Voltage Test Facility
- Wuskwatim Generating Station
- Manitoba Hydro Dorsey Converter Station
- Beeton Hydroelectric Development
- Thorold Cogeneration Project Ontario Canada
- Claresholm Solar Project Alberta
- Halton Hills Combined Cycle Plant
- Highway Rehab -- Bridge replacement Power Dam Interchange 786, United Counties of Stormont, Dundas and Glengarry
