logo

Construction of Allied Structures for Water Treatment Plant [Package-01], Kishtwar, Jammu & Kashmir

Sector: Water Supply and Storage • Location: Kishtwar, Jammu and Kashmir, India

Source: India Investment Grid (IIG)

Project
Closed

Information Public Health Engineering Department, Government of Jammu & Kashmir has come up with Construction of Allied Structures for Water Treatment Plant [Package-01], Kishtwar, Jammu & Kashmir with a ticket size of 11.67 INR Crores. This project in Water Treatment Plants sub-sector involves The current status of the project is Tender Publish and is being developed through the EPC route. Econo

Project Information FAQ

Project Information

5 Q
The project “Construction of Allied Structures for Water Treatment Plant [Package-01], Kishtwar, Jammu & Kashmir” is an infrastructure initiative in the Water Supply and Storage sector, located in Kishtwar, Jammu and Kashmir, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Public Health Engineering Department, Government of Jammu & Kashmir has come up with Construction of Allied Structures for Water Treatment Plant [Package-01], Kishtwar, Jammu & Kashmir with a ticket size of 11.67 INR Crores. This project in Water Treatment Plants sub-sector involves The current status of the project is Tender Publish and is being developed through the EPC route. Economic/Social Impact of the Project Jal Shakti Hydraulic Division proposed a project for laying and fitting of G.I pipes in G-main and D-system. Along with this construction of Slow Sand Filtration Plant of 2000 GPH with chainlink fencing, construction of sedimentation tanks, 8 collection tanks, 1 inlet tanks and construction of boundary wall. The estimated cost of the project is Rs.11.67 Cr. The project is based on EPC Mode.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data