Construction of an aquatic center
Sector: Water Supply and Storage • Location: Quebec, Canada
Source: Infrastructure Canada
The project consists of building an aquatic center comprising: In the basement : - an elevator; - a mechanical room for the elevator; - a link leading to the existing arena. Main floor : - administrative offices; - a vestibule; - changing rooms; - a room for teaching swimming; - a multipurpose room; - storage aeras; - a maintenance and sampling room; - washrooms; - a mechanical room; - a pool mech
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of building an aquatic center comprising: In the basement : - an elevator; - a mechanical room for the elevator; - a link leading to the existing arena. Main floor : - administrative offices; - a vestibule; - changing rooms; - a room for teaching swimming; - a multipurpose room; - storage aeras; - a maintenance and sampling room; - washrooms; - a mechanical room; - a pool mechanical room (filtration and pump) - a staff room; - a lifeguard room; - a 4-lane pool with diving boards and universal access; - a recreational pool with deck and water games; - an infirmary; - maintenance areas; - a link leading to the existing arena. Second floor : - a multipurpose room; - storage space; - bleachers that can accommodate around 80 people, including 3 for people with reduced mobility. The project also includes site development work including, among other things, a new parking lot with approximately 60 spaces. The Department of Recreation and Culture of the City will manage the facility once the work has been completed. In addition, the city has acquired the land where the work will be carried out from the Commission scolaire de Portneuf. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
