Construction of an intermodal terminal in the Logistics Center of the Port of Gdynia.
Sector: Cement • Location: Poland
Source: EU Funding & Tenders Portal
The subject of the project is the construction of an intermodal terminal in the existing Logistics Center of the core network seaport - Port of Gdynia - located on the Baltic – Adriatic Core Network Corridor (CNC). The terminal will increase the sea-to-rail handling of goods, featuring the first stationary vehicle ramp in the Port of Gdynia. Furthermore, it will enable wider use of existing stora
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The subject of the project is the construction of an intermodal terminal in the existing Logistics Center of the core network seaport - Port of Gdynia - located on the Baltic – Adriatic Core Network Corridor (CNC). The terminal will increase the sea-to-rail handling of goods, featuring the first stationary vehicle ramp in the Port of Gdynia. Furthermore, it will enable wider use of existing storage yards, increasing the share of intermodal transport in the Port of Gdynia. The intermodal rail terminal will consist of: 2 tracks with a length of approximately 750 m ending with a stationary loading vehicle ramp, an access track and a link track, a concrete-paved manoeuvring and holding yard, entry road, a railway and road system with railway traffic control equipment. The project includes the use of innovative technologies as part of the railway traffic control system, such as electric heating of turnouts on the basis of atmospheric conditions measured by weather transducers controlled automatically by the railway traffic control system. The new terminal addresses the dual-use requirements, as defined in the Regulation 2021/1328, under railways (railhead operations, max train length, loading gauge) and multimodal equipment handling (ramp axle loading). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
