logo

Construction of Annex building to Computer science Building at IIT Madras

Sector: Commercial • Location: Chennai, Tamil Nadu, India

Source: India Investment Grid (IIG)

Project
Closed

Information CSB building is an RCC framed structure with G plus 3 storeys and a built up area of 6413 Sq.m. The proposed building is connected to existing building through corridors. Staggering of blocks with centre courtyard and open corridor to enhance the wind flow within the building. Under deck insulation is considered to avoid heat ingress. In elevation vertical fins with central massing wer

Project Information FAQ

Project Information

5 Q
The project “Construction of Annex building to Computer science Building at IIT Madras” is an infrastructure initiative in the Commercial sector, located in Chennai, Tamil Nadu, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information CSB building is an RCC framed structure with G plus 3 storeys and a built up area of 6413 Sq.m. The proposed building is connected to existing building through corridors. Staggering of blocks with centre courtyard and open corridor to enhance the wind flow within the building. Under deck insulation is considered to avoid heat ingress. In elevation vertical fins with central massing were created similar to existing building to maintain similarity. Economic/Social Impact of the Project CSB building is an RCC framed structure with G plus 3 storeys and a built up area of 6413 Sq.m. The proposed building is connected to existing building through corridors. Staggering of blocks with centre courtyard and open corridor to enhance the wind flow within the building. Under deck insulation is considered to avoid heat ingress. In elevation vertical fins with central massing were created similar to existing building to maintain similarity.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data