Construction of Clay Township Northeast Group Drainage Pipe
Sector: Water Supply and Storage • Location: Brookville, Ohio, United States of America
Source: Dodge
This project will include installation of 775 of 24 , 1,325 of 18 , 1,131 of 15 , of 100 of 12 subsurface drainage pipe and installation of 750 smooth interior watertight storm pipes with 24 by 36 concrete drop boxes. This will include several connections to the existing drainage that will provide them with an enhanced outlet
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Raw Materials, Waste Processing and Treatment, Commercial
- Location
- Brookville, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Construction of Clay Township Northeast Group Drainage Pipe
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will include installation of 775 of 24 , 1,325 of 18 , 1,131 of 15 , of 100 of 12 subsurface drainage pipe and installation of 750 smooth interior watertight storm pipes with 24 by 36 concrete drop boxes. This will include several connections to the existing drainage that will provide them with an enhanced outlet |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Brookville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Raw Materials, Waste Processing and Treatment, Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
