Information Pondicherry University has come up with Construction of Five Hostels for accommodation of 1250 additional students at Main Campus with a ticket size of 83.54 INR Crores. This project in Education Infrastructure sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project BH-A- Structural

Project Information FAQ

Project Information

5 Q
The project “Construction of Five Hostels for accommodation of 1250 additional students at Main Campus” is an infrastructure initiative in the Education sector, located in Puducherry, Puducherry, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Pondicherry University has come up with Construction of Five Hostels for accommodation of 1250 additional students at Main Campus with a ticket size of 83.54 INR Crores. This project in Education Infrastructure sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project BH-A- Structural work completed upto terrace level, F-6 Level Ceiling plaster work completed, F-6 Level Brick work completed, F-6 Level Internal Wall Plastering work completed, F-6 Level Vitrified Tiles flooring work completed, F-6 Level Internal Plumbing work completed, F-6 Level Internal Electrical Conduit work completed, F-6 Level Fire Fighting work Completed, F-6 Level Wiring completed, WMM work completed BH-B- Structural work completed upto terrace level, -6 Level Ceiling plaster work completed, F-6 Level Brick work completed, F-6 Level Internal Wall Plastering work completed, F-6 Level Vitrified Tiles flooring work completed, F- 6 Level Internal Wall Putty 1st & 2nd coat completed, Terrace water proofing work completed, F-6 Level Internal Plumbing work completed, F-6 Level Internal Electrical Conduit work completed, F-5 Level Corridor Granite Completed, F-6 Level Fire Fighting work Completed, F-6 Level Wiring completed, Sump structure work Completed. GH-A- Structural work completed upto terrace level, F-6 level brick work completed, F-6 level ceiling plaster completed, F-6 Level Internal Wall Plastering work completed, F-6 Level Vitrified Tiles flooring work completed, F-6 Level Internal Electrical Conduit work completed, Outer Wall Plastering completed, F-6 Level Corridor Granite Completed, F-6 Level cupboard work completed, F-6 Level Wiring completed, F-6 Level Flush Door Fixing work completed, F- 6 Level PVC Toilet Door Fixing Completed GH-B-Structural work completed upto terrace level, F-6 level brick work completed, F-6 level ceiling plaster completed, F-6 Level Internal Wall Plastering work completed, F-6 Level Vitrified Tiles flooring work completed, F-6 Level Kadappah slab work completed, F-6 Level Internal Wall Putty 1st & 2nd coat completed, F-6 Level Wall tiles completed, F-6 Level Center OTS Railing completed, F-6 Level Fire Fighting work completed, F-6 Level Flush Door Fixing work completed, F- 6 Level PVC Toilet Door Fixing Completed GH-C- Structural work completed upto terrace level, F-6 level brick work completed, RCC water tank work completed, F-6 Level Internal Wall Plastering work completed, F-6 Level Internal Wall Putty 1st & 2nd coat completed, Terrace water proofing work completed, F-6 Level Internal Electrical Conduit work completed, Outer Wall Plastering completed, F-6 Level Fire Fighting work completed, F-6 Level cupboard work completed, F-6 Level Flush Door Fixing work completed WMM work Completed

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data