logo

Construction of Foundation Drainage Collector (FDC) Pumping Station and Utility Trench dewatering system - in the vicinity of Black Walnut Trail and Cactus Gate (Lisgar)

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Construction of a Foundation Drainage Collector (FDC) Pumping Station and a utility trench dewatering system to address basement water infiltration issues. The objective of the Lisgar Basement Water Infiltration Study was to investigate causes of basement water infiltration in the Lisgar area and to provide a Prioritized Action Plan of mitigation measures for implementation. The Prioritized Action

Project Information FAQ

Project Information

5 Q
The project “Construction of Foundation Drainage Collector (FDC) Pumping Station and Utility Trench dewatering system - in the vicinity of Black Walnut Trail and Cactus Gate (Lisgar)” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction of a Foundation Drainage Collector (FDC) Pumping Station and a utility trench dewatering system to address basement water infiltration issues. The objective of the Lisgar Basement Water Infiltration Study was to investigate causes of basement water infiltration in the Lisgar area and to provide a Prioritized Action Plan of mitigation measures for implementation. The Prioritized Action Plan consisted of the following: a) Strategic lining of priority storm sewers to minimize leakage b) Construction of a utility trench dewatering system c) Monitoring to assess the effectiveness of a) and b) Conditional on the results of the above, consider: d) Building permanent FDC pumping station for high flows e) Replace deficient FDC pipe lengths when they reach the end of their lifecycle As such, the City proceeded with lining of strategic storm sewers beginning in December 2016 and completed approximately 3.3 km of pipe lining using City funding. Subsequent leakage test results indicated that storm sewer lining was not as effective as had been anticipated in preventing stormwater from contributing to the utility trench water build-up. Therefore, Phase 2 of the storm sewer lining program (Doug Leavens Blvd., Osprey Blvd, and Alderwood Trail) has been suspended and the City is moving forward with the construction of an FDC Pumping Station (in addition to the Trench Dewatering System). The objective of all the remedial measures identified in the Prioritized Action Plan remains the same: to mitigate basement water infiltration in the Lisgar area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data