logo

Construction of Four Season Multi-Use Recreation Facility

Sector: Cement • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The main objectives of this project are: - To fill a gap in our community for recreational facilities and activities, which are not currently available to our residents. - Demonstrating strong asset management by renovating our outdoor ice facility that is at the end of its useful life into a 4 season multi-use outdoor recreation facility - To provide the residents of Sioux Narrows-Nestor Falls a

Status
Closed
Sector
Cement
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Construction of Four Season Multi-Use Recreation Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Construction of Four Season Multi-Use Recreation Facility” is an infrastructure initiative in the Cement sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of this project are: - To fill a gap in our community for recreational facilities and activities, which are not currently available to our residents. - Demonstrating strong asset management by renovating our outdoor ice facility that is at the end of its useful life into a 4 season multi-use outdoor recreation facility - To provide the residents of Sioux Narrows-Nestor Falls and adjacent communities with increased opportunity for organized sport and recreation. The proposed project is the construction of dasher boards to form an enclosed rink for the winter months, as well as a basketball court and four pickle ball courts in the summer months. The enclosed structures would be build on a 100 ft by 160 ft slab on grade, to accommodate the 80 ft by 150 ft rink. The basketball court lines and pickle ball court lines would be painted on the concrete pad and the rink lines would be incorporated when the ice surface is introduced. We estimate that this facility would be used by at least 7, 250 people annually. We expect that the use of the facility would include our entire population ranging from toddlers to senior citizens. We anticipate the breakdown of usage to be as follows: 75% of our permanent residents- 750 people 50% of our seasonal residents- 4,000 10% of visitors to our community- 1,000 and approximately an additional 1,500 individuals from neighboring Indigenous Communities.

Original sector

Community, Culture and Recreation

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project