logo

Construction of Garage Côte-Vertu

Sector: Tunnel • Location: Quebec, Canada

Source: Infrastructure Canada

Project
Completed

The Côte-Vertu garage aims to add parking spaces to park additional metro cars, which will eventually improve the frequency of service by adding trains on the orange line during peak hours. This project is also intended to support the growth in ridership planned for the coming years and to ensure an increase in the service offer with a view to a possible extension of the blue line. The chosen scen

Project Information FAQ

Project Information

4 Q
The project “Construction of Garage Côte-Vertu” is an infrastructure initiative in the Tunnel sector, located in Quebec, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Côte-Vertu garage aims to add parking spaces to park additional metro cars, which will eventually improve the frequency of service by adding trains on the orange line during peak hours. This project is also intended to support the growth in ridership planned for the coming years and to ensure an increase in the service offer with a view to a possible extension of the blue line. The chosen scenario consists in building a garage and a connection tunnel at the back-station of the Côte-Vertu station, allowing the addition of 10 parking spaces as well as the installation of a laneway in front of the station in order to improve the operational flexibility of the metro network. In addition, the maintenance pit, currently located behind the Côte-Vertu station, will be moved to the garage. More specifically, but not limited to this list, the specific deliverables under the FITC-funded project component are: - SYSTEM SIGNALING / SUPPLY RADIATION AND CALIBRATION CONCRETE ... (IV01) / ACQUISITION AND INSTALLATION OF ENERGY / TCPE SYSTEMS; SUPPLY OF INDEPENDENT BLOCHETS; SUPPLYING RAILS; SUPPLYING RUNWAYS AND GUIDE BARS; SUPPLY ISOLATOR, FAN AND SECONDARY POST OF DISTRIBUTION; EXCAVATION AND CONCRETE GARAGE CÔTE-VERTU; SECURITY AND SECURITY SERVICE GCV; SUPPLY APPARATUS METRO LINE ON PNEUMATIC; PROFESSIONAL LABORATORY SERVICES FOR THE GARAGE CÔTE-VERTU PROJECT; PROFESSIONAL PRE-INSPECTION SERVICES, ETINFRASTRUCTURE BUILDING POSTINSPECTION, VIBRATION MONITORING DURING WORK AND OTHER SERVICES

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data