Construction of highway between Constanza-Padre de las Casas
Sector: Commercial • Location: Constanza, Dominican Republic
Source: United Nations Industrial Development Organization (UNIDO)
Efficient coverage of the land interconnection road infrastructure network aimed at expanding ecotourism development and agricultural production in the communities located between Constanza and Padre de las Casas. Total lenght is 28.3KM with no tolls contemplated at present but open to discuss it with investor selected.
The proposal not only benefits the inhabitants of Azua and La Vega, but also
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Efficient coverage of the land interconnection road infrastructure network aimed at expanding ecotourism development and agricultural production in the communities located between Constanza and Padre de las Casas. Total lenght is 28.3KM with no tolls contemplated at present but open to discuss it with investor selected. The proposal not only benefits the inhabitants of Azua and La Vega, but also those thousands of citizens who pass through this road every day to carry out commercial activities along the entire Cibao South line. The project seeks to take advantage of the potential for socioeconomic development oriented towards ecotourism and agricultural production in the communities located between Constanza and Padre de las Casas with an impact on aprox. 150, 000 families (TAM). Important to highlight this is, today, a mainly agricultural area, however, with great potential for eco-tourism. The added Value of the project The added value of the project is obtained by adding the salary benefits plus interest and income from the project. In this case, with project interest equal to zero, gross income equal to the savings obtained (not counting subsidies), the following is obtained: VA= 101,306,757.52(salaries) +0 (interest) +146,356,000.00 (savings obtained) PV=DR $247,662,757.52 Value added by the expected results PV=DR $247,662,757.52 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
