Construction of Hud CDBG-Mit Flood Mitigation Bridge Replace
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Project consists of constructing a precast concrete beam bridge 81.67 feet long x 15 feet wide, demolish the existing wooden bridge, remove four (4) existing CMP culverts from stream, rip rap stream banks for bridge foundation protection, roadway work at bridge entrances, and other related work.
- Status
- Closed
- Sector
- Bridge, Cement, Road, Government, Commercial, Water Supply and Storage
- Location
- Hinton, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Construction of Hud CDBG-Mit Flood Mitigation Bridge Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of constructing a precast concrete beam bridge 81.67 feet long x 15 feet wide, demolish the existing wooden bridge, remove four (4) existing CMP culverts from stream, rip rap stream banks for bridge foundation protection, roadway work at bridge entrances, and other related work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Hinton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement, Road, Government, Commercial, Water Supply and Storage |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
