Construction of Lift Station No. 2 Generator Addition
Sector: Water Supply and Storage • Location: Houston, Texas, United States of America
Source: Dodge
Furnish and install a Natural Gas Generator including Foundation and Cement Stabilized Sand Backfill, w/ Sound Attenuating Enclosure, main breaker, Automatic Transfer Switch (ATS), gas line connection from meter to generator, and all necessary electrical and all appurtenances for a complete emergency electrical power system for lift station; site work including sidewalk, wood fence and gate. Compl
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Government, Natural Gas, Manufacturing (Industrial), Automotive
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Construction of Lift Station No. 2 Generator Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnish and install a Natural Gas Generator including Foundation and Cement Stabilized Sand Backfill, w/ Sound Attenuating Enclosure, main breaker, Automatic Transfer Switch (ATS), gas line connection from meter to generator, and all necessary electrical and all appurtenances for a complete emergency electrical power system for lift station; site work including sidewalk, wood fence and gate. Complete in Place. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Government, Natural Gas, Manufacturing (Industrial), Automotive |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
