logo

Construction of Madan-Khaliajuri Submersible Road and Construction of PC Girder Bridge over Balia River at 37th km.Netrakona -Madan-Khaliajuri Rad

The status, timeline and source of this project. A free account opens every field.

Source: Reconnecting Asia

Project

Construction of Madan-Khaliajuri Submersible Road and Construction of PC Girder Bridge over Balia River at 37th km.Netrakona -Madan-Khaliajuri Rad

Sector
Bridge, Road, Manufacturing (Industrial)
Location
Bangladesh
Updated
22 Jul 2026
Source
Reconnecting Asia

ConstructChat

Ask ConstructChat about Construction of Madan-Khaliajuri Submersible Road and Construction of PC Girder Bridge over Balia River at 37th km.Netrakona -Madan-Khaliajuri Rad

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

2 Q
The project “Construction of Madan-Khaliajuri Submersible Road and Construction of PC Girder Bridge over Balia River at 37th km.Netrakona -Madan-Khaliajuri Rad” is an infrastructure initiative in the Bridge sector, located in Bangladesh. Taiyo aggregates data on it from Reconnecting Asia.

Participants

Not available for this record.

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of Madan-Khaliajuri Submersible Road and Construction of PC Girder Bridge over Balia River at 37th km.Netrakona -Madan-Khaliajuri Rad

Original sector

Road

Location

Country

Bangladesh

Source

Source reliability

Medium

Source

Reconnecting Asia

More Details

Record type

Project

Sector

Bridge, Road, Manufacturing (Industrial)

Article published date

2023-11-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project