Construction of Microgrid System REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This is a Design-Bid-Build Construction project to provide energy resiliency by providing an on-site, automated energy control / generation storage management system: Construct a microgrid system, including a smart grid control system, that will have full islanding capability. The microgrid system will incorporate a new 388kW carport mounted photovoltaic (PV) solar array and 1-340kW natural gas ba
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar, Power Transmission, Commercial, Natural Gas
- Location
- Conroe, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Construction of Microgrid System REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is a Design-Bid-Build Construction project to provide energy resiliency by providing an on-site, automated energy control / generation storage management system: Construct a microgrid system, including a smart grid control system, that will have full islanding capability. The microgrid system will incorporate a new 388kW carport mounted photovoltaic (PV) solar array and 1-340kW natural gas backup generator system, with load-balancing controllers to reduce fuel use. The microgrid system w... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Conroe |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Power Transmission, Commercial, Natural Gas |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
