logo
ProjectClosed

Construction of Microgrid System REBID

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

This is a Design-Bid-Build Construction project to provide energy resiliency by providing an on-site, automated energy control / generation storage management system: Construct a microgrid system, including a smart grid control system, that will have full islanding capability. The microgrid system will incorporate a new 388kW carport mounted photovoltaic (PV) solar array and 1-340kW natural gas ba

Status
Closed
Sector
Power Generation (CCGT), Solar, Power Transmission, Commercial, Natural Gas
Location
Conroe, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Construction of Microgrid System REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Construction of Microgrid System REBID” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Conroe, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This is a Design-Bid-Build Construction project to provide energy resiliency by providing an on-site, automated energy control / generation storage management system: Construct a microgrid system, including a smart grid control system, that will have full islanding capability. The microgrid system will incorporate a new 388kW carport mounted photovoltaic (PV) solar array and 1-340kW natural gas backup generator system, with load-balancing controllers to reduce fuel use. The microgrid system w...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Conroe

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Power Transmission, Commercial, Natural Gas

Article published date

2025-03-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project