Construction of Multi-Use Trail
Sector: Hydro • Location: Ontario, Canada
Source: Infrastructure Canada
The project will construct a 600 metre, multi-use trail adjacent to Highway 105. The work will include: clearing, grubbing, excavating and removing fill; installing geotextile for the sub-base; supplying, placing and compacting gravel; paving the surface and rest stops; extending existing culverts; installing mounted lighting to existing hydro poles; and placing benches.
- Status
- Closed
- Sector
- Hydro, Road, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Construction of Multi-Use Trail
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will construct a 600 metre, multi-use trail adjacent to Highway 105. The work will include: clearing, grubbing, excavating and removing fill; installing geotextile for the sub-base; supplying, placing and compacting gravel; paving the surface and rest stops; extending existing culverts; installing mounted lighting to existing hydro poles; and placing benches. |
Original sector | Active Transportation |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hydro, Road, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
